Sod is basically grass. The only difference is that it is not grown on soil. The cultivation process is done by some specialized turf farmers in specialized farms. When it is ready, it is harvested using specialized farm equipment. It is usually cut precisely into standardized square or rectangular sizes. This are then rolled and transported to the target market in order to be sold. Sod installation can then be done afterwards.

Golf courses, lawns and sports stadiums are places where harvested sod is used. Home builders and landscapers usually use sods too, especially on residential projects. Soil erosion can be avoided by installing these products in a place. It is also useful in places damaged during sporting activities, which include sports field.

The process of laying turf in the targeted area is referred to as installation of sod. During this process, one needs to pay a lot of focus, concentration and enough time when installing. First, an individual has to keep in mind some factors before buying and installing sods in the required area. One has to know the number of sods needed. This can be achieved by taking the measurements of the required area.

It is also very paramount to determine the type of grass. This can be done by testing the soil around the area. Doing that ensures that the soil matches with sods. One is also advised to take note of other issues that may hinder performance when turf is installed. The time to carry on this process is also a factor. This determines the time when to buy.

There are various steps taken before setting up the product. The first step is for one to prepare the soil. Turf has a shorter shelf life and therefore, the soil needs to be prepared earlier before it is installed. Removal of debris and weeds is one way of preparing the soil. Removal of the current lawn is also necessary. The purpose for this is to stop competition between the weeds and grass.

One needs to install the turf along the longest straight line. This could be driveways or sidewalks. Make sure the edges are pushed against each other but avoid stretching the turf in order to avoid gaps in between or even overlaps. The joints in each rows of the turf should be staggered. Trim the sod using a large and sharp knife or machete. Avoid using a blunt object at all times for it destroys the sod.

It is necessary for the grass to be watered after being set up. Water helps the soil to be well bonded with turf. This should be done on weekly basis . The purpose of doing this is to moisturize the soil and maintenance of underfoot. Making the soil to be exceedingly wet is not necessary.

Frequent maintenance care is required after the installation. The product is expected to be fertilized and mowed. Pests should also be controlled and done or conducted by recommended persons. Weeds also need to be controlled or may cause injury to newly placed sd. All this is to ensure that the grass stays healthy.